Did not become law. It stopped in the Senate on June 8, 2005. The 2005 session has ended.
2005 Regular Session
Senate Bill 1137
AN ACT CONCERNING CONSTRUCTION OF ELECTRIC TRANSMISSION LINES.
What it does
The synopsis the General Assembly published with the bill.
To permit a developer or owner of an electric generating facility to apply for environmental locational installed capacity payments.
Sponsors
Who carried the bill in each chamber, and who signed on. Each name leads to the member's page.
Its course
February 18 to June 8, 2005, on one scale. In the top row each mark is a day something happened; taller marks are busier days.
Each committee stop sits inside its chamber.
Every action12 actions on 7 days
In the SenateFeb 18 to Jun 8 · stopped110 days
Energy and Technology CommitteeFeb 18 to Mar 2232 days
Text
Each version as the General Assembly printed it.
l9n doesn't hold this bill's text yet.
What happened
In l9n's words, one line for each step. Every action as the General Assembly published it is below.
In the Senate Feb 18 – Mar 22
- Feb 18Introduced and sent to Energy and Technology Committee
- Feb 25Heard in Energy and Technology Committee
- Mar 22Energy and Technology Committee recommended a substitute for it
All 12 actions, as published
- Feb 18REF. TO JOINT COMM. ONBoth houses
- Feb 25PUBLIC HEARINGBoth houses
- Mar 22FILED WITH LCOBoth houses
- Mar 22Joint Favorable SubstituteBoth houses
- Apr 1REFERRED TO OLR, OFABoth houses
- Apr 7RPTD. OUT OF LCOBoth houses
- Apr 7FAV. RPT., TAB. FOR CAL., SEN.Senate
- Apr 7SENATE CALENDAR NUMBERSenate
- Apr 7FILE NO.Both houses
- May 4MOVED TO FOOT OF CAL., SENATESenate
- Jun 8REMOVED FOOT OF CALENDAR SENATESenate
- Jun 8MATTER PASS RETAINEDSenate